Deloitte Tower
Back to projects fordeconstruction
Date
Sector
Project type
Specificities
2019-2021
Montreal
Deconstruction
Structural Dismantling
Date
2019-2021
Sector
Montreal
Project type
Deconstruction
Specificities
Structural Dismantling
Deconstruction
Major transformation of existing infrastructure for the implementation of the new Metropolitan Express Network (REM).
The mandate included:
- Asbestos removal from the ceilings of railway tunnels
- Structural demolition of existing platforms
- Safe and methodical removal of multiple structural elements in a complex and active environment
Challenges and Issues:
- Work in a dense urban environment and active railway infrastructure
- Rigorous management of hazardous materials (asbestos)
- Coordination with other trades and REM authorities
- Compliance with railway safety requirements and operational continuity
Results:
- Deconstruction carried out according to the highest safety standards
- Complete asbestos removal in compliance with environmental regulations
- Site prepared to accommodate the new REM installations