Date
Sector
Project type
Specificities
2019-2021
Montreal
Deconstruction
Structural Dismantling
Date
2019-2021
Sector
Montreal
Project type
Deconstruction
Specificities
Structural Dismantling

Deconstruction

Major transformation of existing infrastructure for the implementation of the new Metropolitan Express Network (REM).
The mandate included:

  • Asbestos removal from the ceilings of railway tunnels
  • Structural demolition of existing platforms
  • Safe and methodical removal of multiple structural elements in a complex and active environment

Challenges and Issues:

  • Work in a dense urban environment and active railway infrastructure
  • Rigorous management of hazardous materials (asbestos)
  • Coordination with other trades and REM authorities
  • Compliance with railway safety requirements and operational continuity

Results:

  • Deconstruction carried out according to the highest safety standards
  • Complete asbestos removal in compliance with environmental regulations
  • Site prepared to accommodate the new REM installations